Day of Caring - Trail clearing and Vine Removal

Calendar Happens On Sep 12, 2025
Time 10-11
Expired

Description

The Acorn trail is a popular trail stretching across our property that allows you to truly be immersed in nature and enjoy the scenery. The trail needs to be cleared of any sticks, overgrowth, or trash in the path. This can either be pulling things by hand, using shears, or rolling off the trail. Fletcher (Mostly back loading dock and the side of the building facing the lake) needs all of the vines from the walls, roof, and dock removed. They should be able to be pulled off easily, but trimming shears are available. 

Details

Get Connected Icon Is Family Friendly
Get Connected Icon Register by Sep 8, 2025
Get Connected Icon Is Outdoors
Inclement Weather Plan: Backup plan will be to remove any birds nests, and assist teams indoors for the other projects.
Get Connected Icon Is Not Wheelchair Accessible

Location

Location Dot Shift 434 Page Pond Rd
Deposit, NY  13754